Laying of Steel Reinforcement in Deck slab at Changay in progress.
Date: 01st December-2023 (04:46 PM)
Work resumed at Km 11th along bojeck Diversion Road.
Date: 01st December-2023 (10:05 AM)
Laying of DGBM ongoing along Ranka Sichey road.
Date: 22nd November-2023 (03:33 PM)
Inspection of Site by DE ,AE, JE concern along with the contractor for the ongoing carpeting work along Duga Pacheykhani Road
Date: 21st November-2023 (08:25 PM)
The site for proposed Suspension foot bridge over Teesta river at goskan dara to connect south district (Aadarsh gaon) was visited by CE Sir and S.E Sir(N/E) along with J.E's n also the numerous works under Singtam Sub-division was visited.
Date: 20th November-2023 (02:45 PM))
Laying of WMM along Duga Pacheykhani Road km ( 8 to 12).
Date: 18th November-2023 (10:06 AM)
Laying of 25mm thick BC along Rabong Ralong road (Buddha park area to Rabong Bazaar)
Date: 17th November-2023 (07:48 AM)
Laying of bituminous mastic asphalt on top of the newly laid BC at the approach road to Sochaygang